The Hijri date 24/5/5232 corresponds to the Gregorian date of Saturday, March 1, 5698. The solar calendar date corresponds to 10 Hūt (Pisces) 5076, which all occur on one single day, that is Saturday. In addition, there is one Julian date, which is 3802272.
Gregorian date: | Saturday, March 1, 5698 |
---|---|
Short Gregorian Date: | 3/1/98 |
Hijri date: | Jumada I 24, 5232 AH |
Short Hijri Date: | 24/5/5232 |
Solar date: | 10 Hūt (Pisces) 5076 |
Short Solar Date: | 10/6/5076 |
Day: | Saturday |
Julian date: | 3802272 (Julian) |
According to the calendar, the year 5698 is not a leap year as of March 1, 5698.