The Hijri date 4/4/5450 corresponds to the Gregorian date of Saturday, July 17, 5909. The solar calendar date corresponds to 26 Saratān (Cancer) 5287, which all occur on one single day, that is Saturday. In addition, there is one Julian date, which is 3879475.
Gregorian date: | Saturday, July 17, 5909 |
---|---|
Short Gregorian Date: | 7/17/09 |
Hijri date: | Rabi II 4, 5450 AH |
Short Hijri Date: | 4/4/5450 |
Solar date: | 26 Saratān (Cancer) 5287 |
Short Solar Date: | 26/10/5287 |
Day: | Saturday |
Julian date: | 3879475 (Julian) |
According to the calendar, the year 5909 is not a leap year as of July 17, 5909.