The Hijri date 1/2/4501 corresponds to the Gregorian date of Sunday, August 17, 4988. The solar calendar date corresponds to 26 Asad (Leo) 4366, which all occur on one single day, that is Sunday. In addition, there is one Julian date, which is 3543119.
Gregorian date: | Sunday, August 17, 4988 |
---|---|
Short Gregorian Date: | 8/17/88 |
Hijri date: | Safar 1, 4501 AH |
Short Hijri Date: | 1/2/4501 |
Solar date: | 26 Asad (Leo) 4366 |
Short Solar Date: | 26/11/4366 |
Day: | Sunday |
Julian date: | 3543119 (Julian) |
According to the calendar, the year 4988 is a leap year as of August 17, 4988.