The Hijri date 2/1/4501 corresponds to the Gregorian date of Saturday, July 19, 4988. The solar calendar date corresponds to 28 Saratān (Cancer) 4366, which all occur on one single day, that is Saturday. In addition, there is one Julian date, which is 3543090.
Gregorian date: | Saturday, July 19, 4988 |
---|---|
Short Gregorian Date: | 7/19/88 |
Hijri date: | Muharram 2, 4501 AH |
Short Hijri Date: | 2/1/4501 |
Solar date: | 28 Saratān (Cancer) 4366 |
Short Solar Date: | 28/10/4366 |
Day: | Saturday |
Julian date: | 3543090 (Julian) |
According to the calendar, the year 4988 is a leap year as of July 19, 4988.