The Hijri date 18/2/5412 corresponds to the Gregorian date of Friday, July 19, 5872. The solar calendar date corresponds to 28 Saratān (Cancer) 5250, which all occur on one single day, that is Friday. In addition, there is one Julian date, which is 3865964.
Gregorian date: | Friday, July 19, 5872 |
---|---|
Short Gregorian Date: | 7/19/72 |
Hijri date: | Safar 18, 5412 AH |
Short Hijri Date: | 18/2/5412 |
Solar date: | 28 Saratān (Cancer) 5250 |
Short Solar Date: | 28/10/5250 |
Day: | Friday |
Julian date: | 3865964 (Julian) |
According to the calendar, the year 5872 is a leap year as of July 19, 5872.