The Hijri date 5/2/5181 corresponds to the Gregorian date of Friday, May 22, 5648. The solar calendar date corresponds to 1 Jawzā (Gemini) 5026, which all occur on one single day, that is Friday. In addition, there is one Julian date, which is 3784092.
Gregorian date: | Friday, May 22, 5648 |
---|---|
Short Gregorian Date: | 5/22/48 |
Hijri date: | Safar 5, 5181 AH |
Short Hijri Date: | 5/2/5181 |
Solar date: | 1 Jawzā (Gemini) 5026 |
Short Solar Date: | 1/9/5026 |
Day: | Friday |
Julian date: | 3784092 (Julian) |
According to the calendar, the year 5648 is a leap year as of May 22, 5648.