The Hijri date 4/1/5416 corresponds to the Gregorian date of Sunday, April 23, 5876. The solar calendar date corresponds to 3 Sawr (Taurus) 5254, which all occur on one single day, that is Sunday. In addition, there is one Julian date, which is 3867338.
Gregorian date: | Sunday, April 23, 5876 |
---|---|
Short Gregorian Date: | 4/23/76 |
Hijri date: | Muharram 4, 5416 AH |
Short Hijri Date: | 4/1/5416 |
Solar date: | 3 Sawr (Taurus) 5254 |
Short Solar Date: | 3/8/5254 |
Day: | Sunday |
Julian date: | 3867338 (Julian) |
According to the calendar, the year 5876 is a leap year as of April 23, 5876.