The Hijri date 24/1/5412 corresponds to the Gregorian date of Tuesday, June 25, 5872. The solar calendar date corresponds to 4 Saratān (Cancer) 5250, which all occur on one single day, that is Tuesday. In addition, there is one Julian date, which is 3865940.
Gregorian date: | Tuesday, June 25, 5872 |
---|---|
Short Gregorian Date: | 6/25/72 |
Hijri date: | Muharram 24, 5412 AH |
Short Hijri Date: | 24/1/5412 |
Solar date: | 4 Saratān (Cancer) 5250 |
Short Solar Date: | 4/10/5250 |
Day: | Tuesday |
Julian date: | 3865940 (Julian) |
According to the calendar, the year 5872 is a leap year as of June 25, 5872.