The Hijri date 20/3/1521 corresponds to the Gregorian date of Saturday, June 29, 2097. The solar calendar date corresponds to 8 Saratān (Cancer) 1475, which all occur on one single day, that is Saturday. In addition, there is one Julian date, which is 2487154.
Gregorian date: | Saturday, June 29, 2097 |
---|---|
Short Gregorian Date: | 6/29/97 |
Hijri date: | Rabi I 20, 1521 AH |
Short Hijri Date: | 20/3/1521 |
Solar date: | 8 Saratān (Cancer) 1475 |
Short Solar Date: | 8/10/1475 |
Day: | Saturday |
Julian date: | 2487154 (Julian) |
According to the calendar, the year 2097 is not a leap year as of June 29, 2097.