The Hijri date 4/5/4514 corresponds to the Gregorian date of Monday, June 29, 5001. The solar calendar date corresponds to 8 Saratān (Cancer) 4379, which all occur on one single day, that is Monday. In addition, there is one Julian date, which is 3547817.
Gregorian date: | Monday, June 29, 5001 |
---|---|
Short Gregorian Date: | 6/29/01 |
Hijri date: | Jumada I 4, 4514 AH |
Short Hijri Date: | 4/5/4514 |
Solar date: | 8 Saratān (Cancer) 4379 |
Short Solar Date: | 8/10/4379 |
Day: | Monday |
Julian date: | 3547817 (Julian) |
According to the calendar, the year 5001 is not a leap year as of June 29, 5001.