The Hijri date 1/3/5412 corresponds to the Gregorian date of Wednesday, July 31, 5872. The solar calendar date corresponds to 9 Asad (Leo) 5250, which all occur on one single day, that is Wednesday. In addition, there is one Julian date, which is 3865976.
Gregorian date: | Wednesday, July 31, 5872 |
---|---|
Short Gregorian Date: | 7/31/72 |
Hijri date: | Rabi I 1, 5412 AH |
Short Hijri Date: | 1/3/5412 |
Solar date: | 9 Asad (Leo) 5250 |
Short Solar Date: | 9/11/5250 |
Day: | Wednesday |
Julian date: | 3865976 (Julian) |
According to the calendar, the year 5872 is a leap year as of July 31, 5872.