The Hijri date 1/4/2969 corresponds to the Gregorian date of Friday, May 30, 3502. The solar calendar date corresponds to 9 Jawzā (Gemini) 2880, which all occur on one single day, that is Friday. In addition, there is one Julian date, which is 3000288.
Gregorian date: | Friday, May 30, 3502 |
---|---|
Short Gregorian Date: | 5/30/02 |
Hijri date: | Rabi II 1, 2969 AH |
Short Hijri Date: | 1/4/2969 |
Solar date: | 9 Jawzā (Gemini) 2880 |
Short Solar Date: | 9/9/2880 |
Day: | Friday |
Julian date: | 3000288 (Julian) |
According to the calendar, the year 3502 is not a leap year as of May 30, 3502.