The Hijri date 1/5/4960 corresponds to the Gregorian date of Saturday, March 15, 5434. The solar calendar date corresponds to 24 Hūt (Pisces) 4812, which all occur on one single day, that is Saturday. In addition, there is one Julian date, which is 3705861.
Gregorian date: | Saturday, March 15, 5434 |
---|---|
Short Gregorian Date: | 3/15/34 |
Hijri date: | Jumada I 1, 4960 AH |
Short Hijri Date: | 1/5/4960 |
Solar date: | 24 Hūt (Pisces) 4812 |
Short Solar Date: | 24/6/4812 |
Day: | Saturday |
Julian date: | 3705861 (Julian) |
According to the calendar, the year 5434 is not a leap year as of March 15, 5434.