The Hijri date 13/3/2973 corresponds to the Gregorian date of Friday, March 30, 3506. The solar calendar date corresponds to 10 Hamal (Aries) 2884, which all occur on one single day, that is Friday. In addition, there is one Julian date, which is 3001688.
Gregorian date: | Friday, March 30, 3506 |
---|---|
Short Gregorian Date: | 3/30/06 |
Hijri date: | Rabi I 13, 2973 AH |
Short Hijri Date: | 13/3/2973 |
Solar date: | 10 Hamal (Aries) 2884 |
Short Solar Date: | 10/7/2884 |
Day: | Friday |
Julian date: | 3001688 (Julian) |
According to the calendar, the year 3506 is not a leap year as of March 30, 3506.