The Hijri date 2/4/4979 corresponds to the Gregorian date of Friday, July 23, 5452. The solar calendar date corresponds to 1 Asad (Leo) 4830, which all occur on one single day, that is Friday. In addition, there is one Julian date, which is 3712566.
Gregorian date: | Friday, July 23, 5452 |
---|---|
Short Gregorian Date: | 7/23/52 |
Hijri date: | Rabi II 2, 4979 AH |
Short Hijri Date: | 2/4/4979 |
Solar date: | 1 Asad (Leo) 4830 |
Short Solar Date: | 1/11/4830 |
Day: | Friday |
Julian date: | 3712566 (Julian) |
According to the calendar, the year 5452 is a leap year as of July 23, 5452.