The Hijri date 22/4/2969 corresponds to the Gregorian date of Friday, June 20, 3502. The solar calendar date corresponds to 30 Jawzā (Gemini) 2880, which all occur on one single day, that is Friday. In addition, there is one Julian date, which is 3000309.
Gregorian date: | Friday, June 20, 3502 |
---|---|
Short Gregorian Date: | 6/20/02 |
Hijri date: | Rabi II 22, 2969 AH |
Short Hijri Date: | 22/4/2969 |
Solar date: | 30 Jawzā (Gemini) 2880 |
Short Solar Date: | 30/9/2880 |
Day: | Friday |
Julian date: | 3000309 (Julian) |
According to the calendar, the year 3502 is not a leap year as of June 20, 3502.