The Hijri date 22/5/3969 corresponds to the Gregorian date of Friday, October 7, 4472. The solar calendar date corresponds to 15 Mizān (Libra) 3851, which all occur on one single day, that is Friday. In addition, there is one Julian date, which is 3354705.
Gregorian date: | Friday, October 7, 4472 |
---|---|
Short Gregorian Date: | 10/7/72 |
Hijri date: | Jumada I 22, 3969 AH |
Short Hijri Date: | 22/5/3969 |
Solar date: | 15 Mizān (Libra) 3851 |
Short Solar Date: | 15/1/3851 |
Day: | Friday |
Julian date: | 3354705 (Julian) |
According to the calendar, the year 4472 is a leap year as of October 7, 4472.