The Hijri date 23/6/6567 corresponds to the Gregorian date of Saturday, June 29, 6993. The solar calendar date corresponds to 8 Saratān (Cancer) 6371, which all occur on one single day, that is Saturday. In addition, there is one Julian date, which is 4275381.
Gregorian date: | Saturday, June 29, 6993 |
---|---|
Short Gregorian Date: | 6/29/93 |
Hijri date: | Jumada II 23, 6567 AH |
Short Hijri Date: | 23/6/6567 |
Solar date: | 8 Saratān (Cancer) 6371 |
Short Solar Date: | 8/10/6371 |
Day: | Saturday |
Julian date: | 4275381 (Julian) |
According to the calendar, the year 6993 is not a leap year as of June 29, 6993.