The Hijri date 23/9/4997 corresponds to the Gregorian date of Sunday, June 26, 5470. The solar calendar date corresponds to 5 Saratān (Cancer) 4848, which all occur on one single day, that is Sunday. In addition, there is one Julian date, which is 3719113.
Gregorian date: | Sunday, June 26, 5470 |
---|---|
Short Gregorian Date: | 6/26/70 |
Hijri date: | Ramadan 23, 4997 AH |
Short Hijri Date: | 23/9/4997 |
Solar date: | 5 Saratān (Cancer) 4848 |
Short Solar Date: | 5/10/4848 |
Day: | Sunday |
Julian date: | 3719113 (Julian) |
According to the calendar, the year 5470 is not a leap year as of June 26, 5470.