The Hijri date 24/8/6135 corresponds to the Gregorian date of Saturday, July 9, 6574. The solar calendar date corresponds to 18 Saratān (Cancer) 5952, which all occur on one single day, that is Saturday. In addition, there is one Julian date, which is 4122354.
Gregorian date: | Saturday, July 9, 6574 |
---|---|
Short Gregorian Date: | 7/9/74 |
Hijri date: | Shaaban 24, 6135 AH |
Short Hijri Date: | 24/8/6135 |
Solar date: | 18 Saratān (Cancer) 5952 |
Short Solar Date: | 18/10/5952 |
Day: | Saturday |
Julian date: | 4122354 (Julian) |
According to the calendar, the year 6574 is not a leap year as of July 9, 6574.