The Hijri date 26/1/5076 corresponds to the Gregorian date of Sunday, June 30, 5546. The solar calendar date corresponds to 9 Saratān (Cancer) 4924, which all occur on one single day, that is Sunday. In addition, there is one Julian date, which is 3746875.
Gregorian date: | Sunday, June 30, 5546 |
---|---|
Short Gregorian Date: | 6/30/46 |
Hijri date: | Muharram 26, 5076 AH |
Short Hijri Date: | 26/1/5076 |
Solar date: | 9 Saratān (Cancer) 4924 |
Short Solar Date: | 9/10/4924 |
Day: | Sunday |
Julian date: | 3746875 (Julian) |
According to the calendar, the year 5546 is not a leap year as of June 30, 5546.