The Hijri date 27/6/4821 corresponds to the Gregorian date of Monday, June 29, 5299. The solar calendar date corresponds to 8 Saratān (Cancer) 4677, which all occur on one single day, that is Monday. In addition, there is one Julian date, which is 3656660.
Gregorian date: | Monday, June 29, 5299 |
---|---|
Short Gregorian Date: | 6/29/99 |
Hijri date: | Jumada II 27, 4821 AH |
Short Hijri Date: | 27/6/4821 |
Solar date: | 8 Saratān (Cancer) 4677 |
Short Solar Date: | 8/10/4677 |
Day: | Monday |
Julian date: | 3656660 (Julian) |
According to the calendar, the year 5299 is not a leap year as of June 29, 5299.