The Hijri date 28/6/5997 corresponds to the Gregorian date of Sunday, June 24, 6440. The solar calendar date corresponds to 3 Saratān (Cancer) 5818, which all occur on one single day, that is Sunday. In addition, there is one Julian date, which is 4073397.
Gregorian date: | Sunday, June 24, 6440 |
---|---|
Short Gregorian Date: | 6/24/40 |
Hijri date: | Jumada II 28, 5997 AH |
Short Hijri Date: | 28/6/5997 |
Solar date: | 3 Saratān (Cancer) 5818 |
Short Solar Date: | 3/10/5818 |
Day: | Sunday |
Julian date: | 4073397 (Julian) |
According to the calendar, the year 6440 is a leap year as of June 24, 6440.