The Hijri date 29/12/4063 corresponds to the Gregorian date of Saturday, July 21, 4564. The solar calendar date corresponds to 30 Saratān (Cancer) 3942, which all occur on one single day, that is Saturday. In addition, there is one Julian date, which is 3388229.
Gregorian date: | Saturday, July 21, 4564 |
---|---|
Short Gregorian Date: | 7/21/64 |
Hijri date: | Dhu al-Hijjah 29, 4063 AH |
Short Hijri Date: | 29/12/4063 |
Solar date: | 30 Saratān (Cancer) 3942 |
Short Solar Date: | 30/10/3942 |
Day: | Saturday |
Julian date: | 3388229 (Julian) |
According to the calendar, the year 4564 is a leap year as of July 21, 4564.