The Hijri date 29/8/5196 corresponds to the Gregorian date of Saturday, June 30, 5663. The solar calendar date corresponds to 9 Saratān (Cancer) 5041, which all occur on one single day, that is Saturday. In addition, there is one Julian date, which is 3789609.
Gregorian date: | Saturday, June 30, 5663 |
---|---|
Short Gregorian Date: | 6/30/63 |
Hijri date: | Shaaban 29, 5196 AH |
Short Hijri Date: | 29/8/5196 |
Solar date: | 9 Saratān (Cancer) 5041 |
Short Solar Date: | 9/10/5041 |
Day: | Saturday |
Julian date: | 3789609 (Julian) |
According to the calendar, the year 5663 is not a leap year as of June 30, 5663.