The Hijri date 4/6/5021 corresponds to the Gregorian date of Friday, June 23, 5493. The solar calendar date corresponds to 2 Saratān (Cancer) 4871, which all occur on one single day, that is Friday. In addition, there is one Julian date, which is 3727511.
Gregorian date: | Friday, June 23, 5493 |
---|---|
Short Gregorian Date: | 6/23/93 |
Hijri date: | Jumada II 4, 5021 AH |
Short Hijri Date: | 4/6/5021 |
Solar date: | 2 Saratān (Cancer) 4871 |
Short Solar Date: | 2/10/4871 |
Day: | Friday |
Julian date: | 3727511 (Julian) |
According to the calendar, the year 5493 is not a leap year as of June 23, 5493.