The Hijri date 6/4/6286 corresponds to the Gregorian date of Friday, August 27, 6720. The solar calendar date corresponds to 5 Sonbola (Virgo) 6098, which all occur on one single day, that is Friday. In addition, there is one Julian date, which is 4175728.
Gregorian date: | Friday, August 27, 6720 |
---|---|
Short Gregorian Date: | 8/27/20 |
Hijri date: | Rabi II 6, 6286 AH |
Short Hijri Date: | 6/4/6286 |
Solar date: | 5 Sonbola (Virgo) 6098 |
Short Solar Date: | 5/12/6098 |
Day: | Friday |
Julian date: | 4175728 (Julian) |
According to the calendar, the year 6720 is a leap year as of August 27, 6720.