The Hijri date 7/12/4063 corresponds to the Gregorian date of Friday, June 29, 4564. The solar calendar date corresponds to 8 Saratān (Cancer) 3942, which all occur on one single day, that is Friday. In addition, there is one Julian date, which is 3388207.
Gregorian date: | Friday, June 29, 4564 |
---|---|
Short Gregorian Date: | 6/29/64 |
Hijri date: | Dhu al-Hijjah 7, 4063 AH |
Short Hijri Date: | 7/12/4063 |
Solar date: | 8 Saratān (Cancer) 3942 |
Short Solar Date: | 8/10/3942 |
Day: | Friday |
Julian date: | 3388207 (Julian) |
According to the calendar, the year 4564 is a leap year as of June 29, 4564.