The Hijri date 8/5/1934 corresponds to the Gregorian date of Tuesday, April 29, 2498. The solar calendar date corresponds to 9 Sawr (Taurus) 1876, which all occur on one single day, that is Tuesday. In addition, there is one Julian date, which is 2633555.
Gregorian date: | Tuesday, April 29, 2498 |
---|---|
Short Gregorian Date: | 4/29/98 |
Hijri date: | Jumada I 8, 1934 AH |
Short Hijri Date: | 8/5/1934 |
Solar date: | 9 Sawr (Taurus) 1876 |
Short Solar Date: | 9/8/1876 |
Day: | Tuesday |
Julian date: | 2633555 (Julian) |
According to the calendar, the year 2498 is not a leap year as of April 29, 2498.