The Hijri date 11/5/4515 corresponds to the Gregorian date of Friday, June 25, 5002. The solar calendar date corresponds to 4 Saratān (Cancer) 4380, which all occur on one single day, that is Friday. In addition, there is one Julian date, which is 3548178.
| Gregorian date: | Friday, June 25, 5002 |
|---|---|
| Short Gregorian Date: | 6/25/02 |
| Hijri date: | Jumada I 11, 4515 AH |
| Short Hijri Date: | 11/5/4515 |
| Solar date: | 4 Saratān (Cancer) 4380 |
| Short Solar Date: | 4/10/4380 |
| Day: | Friday |
| Julian date: | 3548178 (Julian) |
According to the calendar, the year 5002 is not a leap year as of June 25, 5002.