The Hijri date 23/11/5512 corresponds to the Gregorian date of Friday, April 24, 5970. The solar calendar date corresponds to 4 Sawr (Taurus) 5348, which all occur on one single day, that is Friday. In addition, there is one Julian date, which is 3901671.
Gregorian date: | Friday, April 24, 5970 |
---|---|
Short Gregorian Date: | 4/24/70 |
Hijri date: | Dhu al-Qidah 23, 5512 AH |
Short Hijri Date: | 23/11/5512 |
Solar date: | 4 Sawr (Taurus) 5348 |
Short Solar Date: | 4/8/5348 |
Day: | Friday |
Julian date: | 3901671 (Julian) |
According to the calendar, the year 5970 is not a leap year as of April 24, 5970.